Scope: EPC of Tank Farm with Import Berth Facilities
- Berth Facilities for 120,000 DWT
- Firewater Pump House
- 8 No. of Tanks with Geodesic and Internal Floating Roof (30,000 m3 Each)
- Interconnecting Pipelines (100,000 Dia Inch)
- Substation and Storage Building
- E& I Works
- Steel Structure
- Equipment (Pumps, Loading Arms, etc)
- External Works, Drainage, Roads
Construction method video may be viewed here.
Client
- Petrochemical Corporation of Singapore (PCS)
Period
- December 2015 - September 2017