Melaka 2,242 MW CCGT Power Plant

Melaka, Malaysia

Onshore and Offshore packages for Intake and Discharge system, including:

  • Temporary Jetty
  • Fabrication Laydown
  • Intake and Outfall Culvert
  • Intake Pump System
  • Discharge Stilling Basin

 

Client

  • Hyundai Engineering Co., Ltd

Period

  • November 2017 - December 2019
  • (26 months)