LNG Re-Gasification Terminal 2

Pengerang, Malaysia

Scope: Sea Water Intake Structure

  • Onshore: Temporary shoring works & construction of Intake Pumping Station and Pipe trench
  • Offshore : Precast and Installation of Intake Header, Dredging works, and Laying of GRP pipe.

Owner

  • Petroliam Nasional Berhad (Petronas)

Location

  • Pengerang, Malaysia