LNG Re-Gasification Terminal 2
Pengerang, Malaysia
Scope: Sea Water Intake Structure
- Onshore: Temporary shoring works & construction of Intake Pumping Station and Pipe trench
- Offshore : Precast and Installation of Intake Header, Dredging works, and Laying of GRP pipe.
Owner
- Petroliam Nasional Berhad (Petronas)
Location
- Pengerang, Malaysia