Located in Seletar, the Punggol Barat C3 project will serve as a channel for the loads from the Construction Industries Park at Pulau Punggol Timor for treatment at the Changi Water Reclamation Plant, which we also played a part in in our C22B project. Just as we are now commissioning our C22B project in 2022, we are embarking on the transport system to feed wastewater into it!

Scope: Sewage Pipeline Works and Bridge Construction at Pulau Punggol Barat Area (In Progress)

  • DN800 Ductile Iron pipe installation – 690m (Open cut), 770m (Pipe Bridge), 680m (Pipe Jacking)
  • Cast in-situ concrete (RC Chambers, Bridge Piers, Raft Foundation) – 4,000m³
  • Precast concrete I-Girder for bridge – 800m³
  • RC Spun Pile Dia 1200 – 35 nos.
  • RC Square Pile (300×300 & 200×200) – 269 nos.
  • Excavation and backfilling – 9000m³
  • ERSS – 4,000 tons, including 3 nos. of Cofferdam

Client

  • PUB, Singapore's National Water Agency

Period

  • Jul 2021 - Jul 2024